IT for Construction
Construction IT lives in the field. We run the tech for general contractors, specialty trades, and A&E firms whose teams operate from job-site trailers, dust-filled offices, and the cab of a truck — with the integrations that connect Procore, Bluebeam, AutoCAD, and the back office.
The five problems we fix first in construction.
These are the patterns we hear in the first call, every time. The order matters — solving them in this sequence keeps the work calm and the budget predictable.
- 01
Trailers without reliable internet
Bonded LTE / 5G failover, hardened on-site routers, VPN that survives spotty connectivity. Plans should load in seconds, not minutes.
- 02
PMs working off three competing apps
Procore, Bluebeam, Microsoft Project, e-mail, and a paper RFI book. We integrate the platforms or replace the workflow that doesn't need to exist.
- 03
Devices that can't survive a job site
We deploy ruggedized phones and tablets, with MDM that respects field reality (no SCIM rules that lock people out at 7 AM).
- 04
Office staff drowning in paper RFIs and POs
Field-to-office digital workflows — Procore + Bluebeam Studio + accounting integration — eliminate manual re-entry.
- 05
Sub-contractor file sharing chaos
External access controls that don't require everyone to share a Dropbox folder. Time-bound, audited, branded.
The construction playbook.
- 01
Every construction engagement starts with a job-site visit, not just an office walk-through. We see the trailer, the dust, the radios, the foreman's phone-call rhythm, and design tech that fits the actual job.
- 02
Connectivity is the foundation: bonded LTE / 5G with cellular failover at the trailer, hardened routing that survives outages, VPN that auto-reconnects when the truck moves between cell sites.
- 03
Plan-room digitization gets specific attention. Bluebeam Studio sessions, Procore documents, Trimble integrations — built so PMs can mark up plans in the trailer and field crews can pull current revisions on a phone.
- 04
Device strategy matches reality: ruggedized hardware, MDM with selective wipe, remote support tooling that works at 5% battery on a job-site Wi-Fi connection.
Aligned with the rules your auditors ask about.
OSHA-adjacent record keeping
Safety incident logs, training records, and inspection documentation kept on platforms that survive a regulatory request.
DBE / MBE / WBE reporting
IT systems that produce the reports your minority-owned status programs require.
CMMC for federal-adjacent work
Federal projects increasingly require CMMC. We help GCs and subs hit Level 1 or Level 2.
Bonding / insurance attestations
Cybersecurity-related attestations for bonding underwriters and project insurers.
Tools we know inside out.
We bring vendor relationships and deployment muscle for the platforms that run construction every day.
Services that fit construction.
Mid-sized GC, 180 staff, 22 active projects
Replaced job-site MiFi devices with bonded LTE/5G routers; "plan loading slowly" complaints dropped 80%. Integrated Procore with Sage 300 CRE for automatic cost-code population; eliminated 60+ hours/month of accounting re-entry. Deployed MDM-managed ruggedized phones to PMs and superintendents; device replacement cycle dropped from 14 months to 28.
Tell us about your construction environmentCommon construction questions.
Don’t see yours? Drop us a note — we answer every email personally, usually within the hour.
Can you support our trailer connectivity?
Yes. Bonded LTE/5G with cellular failover, hardened routing, VPN that survives intermittent connectivity. We install on-site and replace gear when projects move.
Will you support Procore / Bluebeam / Trimble?
Yes. Procore, Autodesk Construction Cloud, Bluebeam Revu / Studio, Trimble Connect, BIM 360 — all supported, with integrations to accounting (Sage 300 CRE, Viewpoint, Foundation) and project management.
How do you handle ruggedized devices?
We deploy and manage ruggedized phones and tablets — Samsung XCover, Cat phones, Panasonic Toughpads — with MDM that handles field reality (no aggressive lockout policies that strand a foreman at 7 AM).
Can you handle CMMC for federal work?
Yes. CMMC Level 1 and 2 readiness — SSP, POAM, and evidence pack — for GCs and subs taking federal-adjacent work.
What about sub-contractor file sharing?
External access controls in M365 / Procore that don't require shared Dropbox folders. Time-bound, audited, watermarked when appropriate. Off-boarded automatically when the project closes out.
Leading IT
Solutions.
Tell us about your stack, your bottlenecks, your wishlist. We’ll send back a written plan inside 48 hours — no pitch deck, no pressure, no contract talk until you ask for it.
